Category: Connection Setup · Last updated 16 Nov 2026
Connecting nbn when there's no existing infrastructure at your address
What happens when your property needs new nbn infrastructure built.
Occasionally a property has no nbn infrastructure at all - often a new build outside an estate, a rural block, or a property that never had a working phone line. In these cases, extra work is needed before a service can be connected.
What's involved
nbn Co assesses the property and works out what needs to be built. This can range from a short cable run to your home to a more significant extension of the network. In some cases, extra charges from nbn Co may apply.
What to expect
These connections take longer and are less predictable than a standard order, because they depend on nbn Co's design and construction process rather than a simple appointment booking.
If extra charges apply, we'll get a quote and timeframe from nbn Co before you commit, so there are no surprises. A mobile broadband data plan can keep you online in the meantime.
Related Articles
- Connection SetupHow to order a new nbn internet plan with Lightning IPA step-by-step guide to ordering a new nbn plan with Lightning IP, from checking your address to choosing a plan and what happens next.
- Connection SetupWhat happens after you place your nbn order?What to expect between placing your order and going live.
- Connection SetupDo I need a technician appointment to connect nbn?When an nbn technician visit is required, and when it isn't.
- Connection SetupWhat to expect during an nbn technician installationWhat happens when the nbn technician arrives, how long the visit usually takes, where the equipment goes and what you'll need to have ready.
Was this article helpful?
Your feedback helps us improve our support content.