---
title: "Connecting nbn when there's no existing infrastructure at your address"
description: "What happens when your property needs new nbn infrastructure built."
url: "https://www.lightningip.com.au/help/internet/connecting-nbn-no-existing-infrastructure"
canonical: "https://www.lightningip.com.au/help/internet/connecting-nbn-no-existing-infrastructure"
updated: "2026-11-16"
---

# Connecting nbn when there's no existing infrastructure at your address

What happens when your property needs new nbn infrastructure built.

Occasionally a property has no nbn infrastructure at all - often a new build outside an estate, a rural block, or a property that never had a working phone line. In these cases, extra work is needed before a service can be connected.

## What's involved

nbn Co assesses the property and works out what needs to be built. This can range from a short cable run to your home to a more significant extension of the network. In some cases, extra charges from nbn Co may apply.

## What to expect

These connections take longer and are less predictable than a standard order, because they depend on nbn Co's design and construction process rather than a simple appointment booking.

If extra charges apply, we'll get a quote and timeframe from nbn Co before you commit, so there are no surprises. A mobile broadband data plan can keep you online in the meantime.
