---
title: "Standard Form of Agreement – Section B: Enterprise Fibre"
description: "Dedicated symmetrical fibre, quoted per site, with a 12, 24 or 36 month term."
url: "https://www.lightningip.com.au/terms-and-policies/sfoa-section-b-enterprise-fibre"
canonical: "https://www.lightningip.com.au/terms-and-policies/sfoa-section-b-enterprise-fibre"
updated: "2026-11-17"
---

# Standard Form of Agreement – Section B: Enterprise Fibre

Dedicated symmetrical fibre, quoted per site, with a 12, 24 or 36 month term.

- **Version:** 0.4
- **Effective from:** 01 July 2026

## 1. About your Enterprise Fibre Service

What Enterprise Fibre is, how it differs from a standard nbn plan, and which wholesale network delivers it.

### 1.1 What an Enterprise Fibre Service is

_In short: Dedicated, symmetrical business fibre built to your site, quoted per site._

An Enterprise Fibre Service is a dedicated, business-grade fibre access service delivered to a single site, together with internet access and related services we supply over it.

The things that characterise it are:

(a) the access is **dedicated** rather than contended — the capacity you buy is not shared with other customers in the way a mass-market service is;
(b) it is **symmetrical**, so upload and download speeds are the same;
(c) it is delivered over a **point-to-point IP allocation (a /31)**; and
(d) it is **quoted per site**, because what it costs and how long it takes depend on the fibre that has to be built to reach you.

An Enterprise Fibre Service is not a standard telephone service, and the CSG does not apply to it — see *The Customer Service Guarantee* clause in Section A.

### 1.2 The networks we use to deliver it

_In short: We deliver Enterprise Fibre over more than one wholesale network, and we work with you to choose the right one for your site and your needs._

We deliver Enterprise Fibre Services over wholesale fibre access products supplied by our Suppliers — currently nbn Enterprise Ethernet, supplied by nbn, and Telstra Wholesale Ethernet Access, supplied by Telstra Wholesale.

We will work with you to make sure the right network is chosen for your location and your needs — taking into account what can be delivered at your address, what it will cost to build, how long it will take, and the service levels you require. We will tell you which network your Service uses in your quote, and it will be confirmed on your Application Form.

The service levels, availability targets and any rebates that apply to your Service follow the underlying wholesale product, and are set out in your Application Form and Critical Information Summary. Because different wholesale products carry different service levels, two Enterprise Fibre Services at different sites may not carry identical commitments — we will tell you what applies to each site before you commit.

As with all our Services, our obligations to you are described in the *Our network and our Suppliers* section of Section C: we do not own these networks, and a fault in a Supplier's network must be rectified by that Supplier.

## 2. Getting your Service built

Quoting, site survey, build contributions and timeframes — all of which work differently from a standard connection.

### 2.1 Quoting and site qualification

_In short: Every site is quoted individually, and the quote may depend on a site survey._

Enterprise Fibre is quoted per site. Before we can quote, we (or a Supplier) carry out a site qualification to establish whether fibre can be delivered to your site, what build work is required, and at what cost.

A quote may be:

(a) **indicative**, based on desktop information and subject to a site survey; or
(b) **firm**, where a survey has been completed and the build cost is known.

We will tell you which kind of quote you have. Your quote sets out the monthly Charge, any build contribution, the term options available to you, the service levels that apply, and how an early termination amount would be calculated.

### 2.2 Build contributions and what happens if the cost changes

_In short: If the build costs more than the quote assumed, we'll come back to you rather than just billing you._

A Supplier may require a contribution toward the cost of building fibre to your site. Where a build contribution applies, we will tell you the amount before you commit, and it will be set out in your quote.

If, after a site survey or during the build, the cost of delivering the Service increases materially above what your quote assumed, we will:

(a) tell you as soon as we know, and explain why;
(b) give you a revised quote; and
(c) give you the choice of proceeding on the revised terms or cancelling the order.

If you cancel in those circumstances, you will not pay an early termination Charge, and we will only charge you for costs already reasonably incurred at your direction — as described in the *If you change your mind before we connect your Service* clause in Section A.

We will not increase a firm quoted build contribution after you have accepted it, except where the increase results from something you have asked us to change, or from a condition at the site that could not reasonably have been identified during the survey.

### 2.3 Build timeframes

_In short: Build times are quoted per site and depend on the civil work involved._

Because each site requires fibre to be built or extended, the timeframe to deliver an Enterprise Fibre Service depends on the work involved, and is quoted per site.

Build times are commonly measured in weeks to months rather than days, and can be affected by matters outside our control — including obtaining consents and permits, road and footpath access, weather, and a Supplier's construction scheduling.

We will give you the expected timeframe in your quote, tell you promptly if it changes, and keep you informed of progress during the build. We do not guarantee a build completion date, and we are not liable for loss arising from a delay in a Supplier's build programme — but if a build is delayed beyond a reasonable period, you may cancel the order without an early termination Charge.

### 2.4 Access, consents and work at your site

_In short: Civil and in-building work needs consents, and getting them is usually the biggest cause of delay. If a consent falls through on your side, a termination fee waiver may not be available._

An Enterprise Fibre build usually involves civil work outside your site and cabling work inside it. Before that work can start, consents are often needed — from the building owner, a body corporate or owners corporation, a landlord, a neighbouring property owner, or a local authority.

You must:

(a) obtain, or help us obtain, any consent required for the build, and give us the contact details of the people whose consent is needed;
(b) give safe access to the site as described in the *Access to your premises* clause in Section A, including access to risers, communications rooms, and any path the fibre must take; and
(c) tell us about anything at the site that affects the work, including hazardous materials, heritage restrictions, or restrictions on when work can be carried out.

Delays in obtaining consents are the most common cause of delay in an Enterprise Fibre build, and they sit outside our control. Where a required consent cannot be obtained for reasons outside your control, the Service may not be able to be delivered, and we will discuss your options with you — including cancelling the order without an early termination Charge.

Where a required consent is not obtained because of something within your control — for example, you decline to give a consent that is yours to give, you do not take the steps reasonably required of you under paragraph (a), or you withdraw a consent you have given — you may not be eligible for a waiver of the early termination Charge, and any Charge for work already carried out by us or a Supplier at your request may apply. We will tell you before any such Charge is applied.

## 3. Your term, and ending the Service

The commitment you are making, what it costs to end it early, and why.

### 3.1 Choosing your term

_In short: You choose 12, 24 or 36 months, and you're committing to take the service for that whole period._

When you order an Enterprise Fibre Service you choose a Minimum Term of **12, 24 or 36 months**. Your quote will usually show a different monthly Charge for each option, because a longer term lets the cost of building the service be recovered over a longer period. The term you choose is recorded on your Application Form.

Your Minimum Term starts on the date we activate the Service, not the date you sign or the date the build starts.

**What committing to a term means.** For the length of the term, we supply the Service and you pay for it. The Service continues to be delivered to your site for the whole term whether or not you use it, and the monthly Charge continues to fall due. This is a genuine commitment on both sides — it is what allows the Service to be built for you in the first place.

If your circumstances change during the term, read *Your options if you no longer need the Service during the term*. There are choices available to you, and we would much rather talk about them than have you simply stop paying.

When your Minimum Term ends, the Service continues month to month on the same terms unless you and we agree a new term — see *Minimum terms* in Section A. We will not roll you into a new term without your agreement.

### 3.2 Your options if you no longer need the Service during the term

_In short: You can keep paying monthly, prepay the balance, or cancel outright — but the amount is the same either way, because the Service was built for your site on the basis of the full term._

An Enterprise Fibre Service cannot simply be cancelled part-way through its term. If you no longer need it, you have three options, and it is worth understanding that **all three cost the same** — what differs is whether you keep the Service and how you pay.

**Option 1 — keep the Service and keep paying monthly.** Nothing changes. The Service stays connected and available to your site for the rest of the term, and you pay the monthly Charge as it falls due. If there is any chance you will want the connection again, this is usually the sensible option.

**Option 2 — prepay the balance of the term.** You can choose to pay the remaining monthly Charges as a lump sum. Some customers prefer this — for example, where a business is being wound up and its owners want the account closed and finalised rather than carrying a monthly obligation. The Service remains available for the rest of the term.

**Option 3 — cancel the Service entirely.** You can end the Service, but the remaining Charges for the term are payable as an early termination Charge. So cancelling does not reduce what you pay; it only means the Service is disconnected and cannot be used or reinstated for the balance of the term.

**Why it works this way.** An Enterprise Fibre Service is not pulled off a shelf. It is planned, designed and built for your specific site, and the equipment is installed for it, on the basis that the Service will be in place for the term you have chosen. The monthly Charge spreads that build cost across the term, which is why the commitment runs for the whole term whether or not you keep using the Service.

**What you will be told before you commit.** The termination amounts, and how they are calculated at any point in the term, are set out in your Application Form and Critical Information Summary. Read them before you sign, and ask us if anything is unclear.

**When none of this applies.** You will not pay a termination amount where you end the Service under the *Changes we may make to this Agreement* clause in Section A, where we have failed to supply the Service, where a build is delayed beyond a reasonable period, where we cancel the Service for convenience, or where the law otherwise entitles you to end the Service without charge — including your rights under the Australian Consumer Law if there is a major failure with the Service.

### 3.3 Relocating a site during a term

_In short: Moving an Enterprise Fibre service means building it again somewhere else — so it's treated as a new build, not a move._

An Enterprise Fibre Service is built to a specific site and cannot simply be moved. If you need the Service at a different address during your Minimum Term:

(a) we will treat the new address as a new site, and quote it — including any build contribution required to reach it;
(b) the Service at the old site remains subject to your existing term unless we agree otherwise; and
(c) where we can, we will look at transferring the remaining term to the new site rather than running two commitments, and we will tell you honestly whether that is possible for your sites.

If you are vacating premises and a new occupier wants to take over the Service, contact us. Transferring the Service and its remaining term to them is often the cleanest outcome for everyone, and we will help arrange it where the incoming occupier meets our credit requirements.

## 4. Using your Service

Addressing, service levels and support for a business-grade fibre service.

### 4.1 IP addressing

_In short: Enterprise Fibre is delivered over a point-to-point /31, with static addressing available on request._

An Enterprise Fibre Service is delivered over a point-to-point IP allocation (a /31).

Additional static IP addresses are available on request. Because IPv4 address space is limited and allocations are governed by regional policy:

(a) you will need to make a declaration of your need for the addresses; and
(b) where you request more than one address, you must actively use the additional addresses.

Any IP address we allocate is licensed to you for use with your Service while we supply it, and returns to us when the Service ends.

### 4.2 Service levels and rebates

_In short: Service levels follow the underlying wholesale product, and a rebate is the remedy if one is missed._

The service levels that apply to your Enterprise Fibre Service — including availability targets, fault response and restoration targets, and any rebates — are set out in your Application Form and Critical Information Summary, and reflect what our Supplier owes us for the underlying product.

Where a service level is missed and a rebate applies, the rebate is credited to your account. A rebate is the contractual remedy for a missed service level, but it does not limit your rights under the Australian Consumer Law, and it does not prevent you making a complaint or taking a matter to the TIO.

Rebates do not apply where the failure results from a Force Majeure Event, planned works notified in accordance with the *Planned works and maintenance* section of Section C, an act or omission of yours or of a person at your site, a fault in Your Equipment or internal cabling, or a loss of power at your site.

### 4.3 Faults and support

_In short: Enterprise Fibre faults are escalated on the underlying product's process, which is generally faster than a mass-market service._

Report a fault on an Enterprise Fibre Service the same way as any other Service — see the *Faults and service assurance* section of Section C.

Faults on an Enterprise Fibre Service are raised with the relevant Supplier under that product's fault management process, which generally provides faster response and restoration targets than a mass-market service. Where your Service has an enhanced service level agreement, an out-of-hours fault will be picked up by an on-call technician, as described in *Who we are and how to contact us* in Section A.

The general position on chargeable callouts applies: if a fault turns out to be caused by Your Equipment, your internal cabling or your power supply, a Charge may apply, and we will tell you before arranging a chargeable visit.
