Skip to main content

Help and Advice

What do the nbn service classes mean?

A service class tells your provider about the infrastructure that will supply your premises and how ready it is. Here's what each nbn service class means for you.

Written by

Lightning IP Team

Network and Support

nbn logo

You may have seen "service classes" mentioned when it comes to the nbn network.

A service class tells your retail service provider (RSP) about the infrastructure that will supply a premises and how ready that infrastructure is.

Some service classes mean everything is in place and ready to go. Others mean nbn Co still has work to do before your premises can be connected.

nbn Fibre to the Premises service classes

Service classReady to orderTech visit
Service Class 0NoN/A
Service Class 1YesYes
Service Class 2YesYes
Service Class 3YesNo

Service Class 0: Your premises will be serviceable by Fibre to the Premises (FTTP). You can't order a service just yet, as nbn Co is still completing the supporting infrastructure.

Service Class 1: Your premises is serviceable by FTTP, but there's no external box and no internal nbn Connection Box (sometimes called an NTD) yet. Fibre is in the pits, but nbn Co still needs to connect from the street or pit to your premises. You can order a service and an installation appointment will be booked.

Service Class 2: Your premises is serviceable by FTTP and the external work is done, but the internal nbn Connection Box is yet to be installed. You can order a service now and an appointment will be booked to install it.

Service Class 3: Your premises is serviceable by FTTP. The internal and external work is done and the equipment is installed, so you can order a service without a technician visit.

nbn Fixed Wireless service classes

Service classReady to orderTech visit
Service Class 4NoN/A
Service Class 5YesYes
Service Class 6YesNo

Service Class 4: Your premises is planned to be serviceable by Fixed Wireless, but the tower isn't live yet.

Service Class 5: Your premises is serviceable by Fixed Wireless. When you order, an appointment will be booked to install the antenna and nbn equipment.

Service Class 6: Your premises is serviceable by Fixed Wireless and the equipment is already installed, so a service can be ordered without a technician visit.

nbn Satellite service classes

Service classReady to orderTech visit
Service Class 7NoN/A
Service Class 8YesYes
Service Class 9YesNo

Service Class 7: Your premises is planned to be serviceable by nbn satellite, but a service can't be ordered just yet.

Service Class 8: Your premises is serviceable by satellite, but the satellite dish and nbn equipment haven't been installed. When you order, an appointment will be booked to install them.

Service Class 9: Your premises is serviceable by satellite and the equipment is already installed, so a service can be ordered without a technician visit.

nbn Fibre to the Node and Building service classes

Service classReady to orderTech visit
Service Class 10NoN/A
Service Class 11YesYes
Service Class 12YesIn the street only
Service Class 13YesNo

Service Class 10: Your premises will be serviceable by Fibre to the Node (FTTN) or Fibre to the Building (FTTB). You can't order a service just yet, as nbn Co is still completing the supporting infrastructure.

Service Class 11: Your premises is nbn ready and a service can be ordered. nbn Co still needs to do more work, such as the lead-in and jumpering, before you can be connected.

Service Class 12: Your premises is nbn ready and a service can be ordered. nbn Co still needs to do the jumpering, but this is done at the node or pillar, so a technician won't need to come to your premises.

Service Class 13: The jumpering is already done and your premises is nbn ready. No technician appointment is needed.

nbn Hybrid Fibre Coaxial service classes

Service classReady to orderTech visit
Service Class 20NoN/A
Service Class 21YesYes
Service Class 22YesYes
Service Class 23YesYes
Service Class 24YesNo

Service Class 20: Your premises will be serviceable by Hybrid Fibre Coaxial (HFC). You can't order a service just yet, as nbn Co is still completing the supporting infrastructure.

Service Class 21: Your premises is serviceable by HFC, but there's no lead-in or nbn Connection Box in place. More work is needed before you can be connected.

Service Class 22: Your premises is serviceable by HFC. A lead-in cable is installed, but there's no wall plate or nbn Connection Box yet. More work is needed before you can be connected.

Service Class 23: Your premises is serviceable by HFC. A lead-in cable and wall plate are installed, but the nbn Connection Box is yet to be installed.

Service Class 24: Your premises is serviceable by HFC and is nbn ready. All the infrastructure is in place and a service can be ordered.

nbn Fibre to the Curb service classes

Service classReady to orderTech visit
Service Class 30NoN/A
Service Class 31YesYes
Service Class 32YesYes
Service Class 33YesYes
Service Class 34*YesNo*

Service Class 30: Your premises will be serviceable by Fibre to the Curb (FTTC). You can't order a service just yet, as nbn Co is still completing the supporting infrastructure.

Service Class 31: Your premises is serviceable by FTTC, but more work is still needed.

Service Class 32: Your premises is serviceable by FTTC. A lead-in is available or installed, but it hasn't been connected to the network yet.

Service Class 33: Your premises is serviceable by FTTC. The lead-in is connected to the nbn network, but an nbn connection device (NCD) is still needed.

Service Class 34: Your premises is serviceable by FTTC and is nbn ready. All the infrastructure is in place and a service can be ordered.

*If the NCD has been removed from the premises, a replacement will need to be arranged, and installing it may need a technician appointment.

How long does connecting take?

Your service class is one of the things that decides how long a connection takes, along with where you live. As a guide, nbn Co's current service levels for a standard connection are:

  • 1 business day where the premises is already serviceable and nbn Co doesn't need to attend
  • About 9 to 14 business days in urban areas where nbn work or an appointment is needed
  • About 14 to 19 business days in major and minor rural areas
  • Up to about 35 to 40 business days in remote and isolated areas, depending on the technology

These are nbn Co's targets, not guarantees, and they run from when nbn Co acknowledges the order rather than when you place it. We'll give you the expected timeframe for your address when we accept your order, and tell you if it changes.

All a bit much?

This can feel technical and full of industry terms. If you have questions about your premises or getting connected to the nbn, get in touch with our team and we'll help.

Share this article